H&F Electrical Contractors Ltd successfully completed nationwide upgrades to Garda
station cells, delivering enhanced functionality, compliance, and safety across multiple
locations. The works included a comprehensive electrical refurbishment and the
integration of specialist systems tailored to the unique requirements of the cell areas.

Key elements of the project included:

  • Strip – Out Works: Removal of redundant electrical services and hardware
    conflicting with the new architectural layouts.
  • Power Distribution: Supply and installation of a new electrical sub-distribution
    board and the extension of existing switchboard installations.
  • Specialist System Integration: Connection of cell – specific systems, including
    the Cell Call Alarm System, VESDA fire detection, panic alarm, and electric cell
    heating systems, to the existing low-voltage mains distribution system.
  • Lighting Installations: Installation of general lighting, emergency lighting, and
    specialised lighting systems for cells, corridors, and prisoner shower areas.
  • Control and Communication Systems: Installation of cell call systems, including push-button units, over-door cell light indicators, system panels, and associated wiring. Additional installations included a cell panic strip system, data cabling services, and a two-way intercom at rear doors.
  • Mechanical and Electrical Integration: Complete power and control cabling for mechanical services, along with the installation of cable management systems such as trays, trunking, and conduits.
  • Safety and Security Enhancements: Emergency lighting test units, intruder alarm extensions, and comprehensive access control installations were completed to ensure security and compliance.
  • Earthing and Bonding: Ensuring the safe operation of all systems with a
    complete installation of earthing and bonding.

H&F’s expertise ensured the successful delivery of these critical upgrades, enhancing
operational efficiency and safety within the Garda station network. The project was completed to the highest quality and safety standards, in full compliance with client specifications.